Serving Fort Worth, TX and surrounding areasLicensed and insured(682) 267-4269

Fort Worth Mezzanine Installation (682) 267-4269 Request a quote

Options · Types and designs

Mezzanine Options and Designs in Fort Worth

Pick the type, the deck, the stairs, the gates and any lift. We supply all of it and our crew installs it: one order, one crew, one point of contact for mezzanine installation in Fort Worth.

Two new steel mezzanine designs side by side in a clean warehouse: a storage deck with yellow guardrail and a deck carrying a glazed office

02Types

Which Mezzanine Type Fits Your Building?

The type follows the work: storage, picking, offices or machinery. Free-standing structural steel keeps the floor below open; rack- and shelving-supported decks share the rack's uprights; modular decks bolt together from standard parts; pick modules stack picking over several levels; platforms carry machines or service work. Every type that people use is a mezzanine under IBC 505, with the one-third area rule and 7 feet of clear height above and below.

03Framing

Which Framing System Sets Your Spans?

Framing decides how far apart the columns can be and how much the deck carries, so we size it to your column grid, your load and the services overhead. Light, bolted framing suits smaller bays; beam framing spans farther with a shallow structure; bar joist and truss framing span widest and leave room for lights, sprinklers and ducts; a rigid frame stands without cross-bracing in your aisles.

Framing OptionsOur planning guidance. Your engineer sets the spans and loads for your building.
FramingSpansWhy choose it
Bolted C-sectionShorter baysLower cost where more columns are fine
Beam framingLonger in one or both directionsFewer columns with a shallow structure
Bar joist or trussThe widestRoom for lights, sprinklers and ducts
Rigid (moment) framePer designNo cross-bracing in aisles or forklift paths

04Deck surface

Which Deck Surface Suits Your Floor?

Pick the deck for what rolls, drops or stands on it. Wood or resin board over steel deck suits light storage; smooth composite panels suit carts, pallet jacks and robots, with static-control and fire-rated versions; bar grating lets light, air and sprinkler water through; floor plate takes hard wear; concrete is the heaviest, quietest floor. Your plan review decides what the fire code needs. See the decking page.

05Stairs and ladders

Which Stairs or Ladders Fit Your Deck?

Standard stairs suit daily traffic; steeper stairs and ladders suit occasional or service access. OSHA 1910.25 sets standard stairs at 30 to 50 degrees, and ship stairs and alternating tread stairs at 50 to 70 degrees. Landings are at least the stair width and 30 inches deep. We pick the stair from how often people climb and what they carry.

06Gates

Which Edge and Drop-Zone Gates Do You Need?

A gate at every pallet drop zone and access opening, chosen for how loads arrive. OSHA treats a drop zone as a hoist area that needs fall protection (1910.28(b)(2)), and access openings need a self-closing gate or an offset (1910.29(b)(13)). Two-gate designs keep the ledge closed while loading; swing and sliding gates are simpler. See stairs, railings and gates.

07Lifts

Do You Need a Lift to Reach the Deck?

You need one when forklifts cannot reach the deck edge, or when carts and totes move all day. A vertical reciprocating conveyor (VRC) carries material only, never riders. A rideable material lift carries a worker with the load but is not a public elevator. See mezzanine lifts.

08Add-ons

Which Add-Ons Do Buyers Ask For?

The add-ons buyers ask about most are offices on the deck, lighting and fire protection under it, conveyor supports, load signs and column guards. An office adds weight and must fit the openness rules in IBC 505.2.3. Floors designed for more than 50 psf need load signs before the certificate of occupancy (IBC 106.1 and 106.2).

Sources, read November 2026: 2021 IBC Section 505, via UpCodes (Texas) · 2021 IBC Sections 105 and 106, via UpCodes (Texas) · 2021 IBC Table 1607.1, via UpCodes (Texas) · OSHA 29 CFR 1910.25 · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29 · City of Fort Worth, Commercial Remodel SOP (2020)

09Questions

Mezzanine Options Questions, Answered

Do you supply the mezzanine or only install it in Fort Worth?

We supply and install it. You buy the mezzanine through us: the steel frame, deck, stairs, guardrail, gates and any lift. We coordinate the engineered drawings and the permit submission, and our crew installs it. One order, one crew, one point of contact.

How long is the lead time for a mezzanine?

It depends on the design, the permit review and the parts you choose. Use "Check lead time" on any option, and we reply with the current lead time and the dates for each step in your quote.

Do the options change the permit?

Some do. Offices, enclosed rooms, lifts and sprinkler changes are part of the drawings the city reviews, so we settle the options before the permit is filed.

Source: City of Fort Worth Commercial Remodel SOP

10Request for quote

Request a Quote or a Lead Time

Tell us about the building and the deck. A local installer replies with questions or a quote.

  1. 1Send the size, the use and the clear height.
  2. 2We confirm the layout, the code points and what we supply.
  3. 3You get a written quote with the steps and dates.

Prefer to talk? (682) 267-4269

New steel mezzanine with yellow guardrail and stairs in a bright, clean warehouse

Reliable Mezzanine Installation in Fort Worth

  • Decks sized to your load.
  • Layouts checked to code.
  • Installs planned around your floor.
CallRequest a quote