Options · Types and designs
Mezzanine Options and Designs in Fort Worth
Pick the type, the deck, the stairs, the gates and any lift. We supply all of it and our crew installs it: one order, one crew, one point of contact for mezzanine installation in Fort Worth.

02Types
Which Mezzanine Type Fits Your Building?
The type follows the work: storage, picking, offices or machinery. Free-standing structural steel keeps the floor below open; rack- and shelving-supported decks share the rack's uprights; modular decks bolt together from standard parts; pick modules stack picking over several levels; platforms carry machines or service work. Every type that people use is a mezzanine under IBC 505, with the one-third area rule and 7 feet of clear height above and below.
-

Structural steel mezzanine
Free-standing columns with open floor below. Details.
-

-

Shelving-supported mezzanine
A second tier of small-parts shelving with catwalk aisles.
-

Modular mezzanine
Bolt-together parts you can move or extend later. Details.
-

-

Work or equipment platform
Machinery, staging and service access. Details.
-

Catwalk or crossover bridge
Walkways between shelving and over lines. Details.
-

Elevated office or control room
A windowed room above the floor it runs. Details.
03Framing
Which Framing System Sets Your Spans?
Framing decides how far apart the columns can be and how much the deck carries, so we size it to your column grid, your load and the services overhead. Light, bolted framing suits smaller bays; beam framing spans farther with a shallow structure; bar joist and truss framing span widest and leave room for lights, sprinklers and ducts; a rigid frame stands without cross-bracing in your aisles.
| Framing | Spans | Why choose it |
|---|---|---|
| Bolted C-section | Shorter bays | Lower cost where more columns are fine |
| Beam framing | Longer in one or both directions | Fewer columns with a shallow structure |
| Bar joist or truss | The widest | Room for lights, sprinklers and ducts |
| Rigid (moment) frame | Per design | No cross-bracing in aisles or forklift paths |
04Deck surface
Which Deck Surface Suits Your Floor?
Pick the deck for what rolls, drops or stands on it. Wood or resin board over steel deck suits light storage; smooth composite panels suit carts, pallet jacks and robots, with static-control and fire-rated versions; bar grating lets light, air and sprinkler water through; floor plate takes hard wear; concrete is the heaviest, quietest floor. Your plan review decides what the fire code needs. See the decking page.
-

Wood board over steel deck
Board laid on corrugated steel deck for light storage.
-

Resin board or composite panels
A smooth floor for carts, pallet jacks and robots.
-

-

-

Concrete on form deck
The heaviest, quietest floor, on steel form deck.
05Stairs and ladders
Which Stairs or Ladders Fit Your Deck?
Standard stairs suit daily traffic; steeper stairs and ladders suit occasional or service access. OSHA 1910.25 sets standard stairs at 30 to 50 degrees, and ship stairs and alternating tread stairs at 50 to 70 degrees. Landings are at least the stair width and 30 inches deep. We pick the stair from how often people climb and what they carry.
-

-

Steep-access stairs
Ship stairs and alternating tread stairs, 50 to 70 degrees, for tight spaces.
-

Stair landings
For turns and long runs; at least the stair width and 30 inches deep.
-

Fixed ladders
Service access only, with a self-closing gate at the top.
06Gates
Which Edge and Drop-Zone Gates Do You Need?
A gate at every pallet drop zone and access opening, chosen for how loads arrive. OSHA treats a drop zone as a hoist area that needs fall protection (1910.28(b)(2)), and access openings need a self-closing gate or an offset (1910.29(b)(13)). Two-gate designs keep the ledge closed while loading; swing and sliding gates are simpler. See stairs, railings and gates.
-

-

Double-drop and overhead gates
Paired gates that keep the ledge covered.
-

-

-

-

07Lifts
Do You Need a Lift to Reach the Deck?
You need one when forklifts cannot reach the deck edge, or when carts and totes move all day. A vertical reciprocating conveyor (VRC) carries material only, never riders. A rideable material lift carries a worker with the load but is not a public elevator. See mezzanine lifts.
-

Vertical reciprocating conveyor (VRC)
Pallets, carts and totes between levels; no riders.
-

Rideable material lift
A worker rides with the load; not a public elevator.
08Add-ons
Which Add-Ons Do Buyers Ask For?
The add-ons buyers ask about most are offices on the deck, lighting and fire protection under it, conveyor supports, load signs and column guards. An office adds weight and must fit the openness rules in IBC 505.2.3. Floors designed for more than 50 psf need load signs before the certificate of occupancy (IBC 106.1 and 106.2).
-

Modular office on the deck
Offices above the floor, with the deck rated for them.
-

Lighting and fire protection below
Planned with the deck and reviewed with the permit.
-

Conveyor supports and drop plates
For conveyor runs and loading transitions.
-

-

Column and rack protectors
Where forklifts run near columns and uprights.
Sources, read November 2026: 2021 IBC Section 505, via UpCodes (Texas) · 2021 IBC Sections 105 and 106, via UpCodes (Texas) · 2021 IBC Table 1607.1, via UpCodes (Texas) · OSHA 29 CFR 1910.25 · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29 · City of Fort Worth, Commercial Remodel SOP (2020)
09Questions
Mezzanine Options Questions, Answered
Do you supply the mezzanine or only install it in Fort Worth?
We supply and install it. You buy the mezzanine through us: the steel frame, deck, stairs, guardrail, gates and any lift. We coordinate the engineered drawings and the permit submission, and our crew installs it. One order, one crew, one point of contact.
How long is the lead time for a mezzanine?
It depends on the design, the permit review and the parts you choose. Use "Check lead time" on any option, and we reply with the current lead time and the dates for each step in your quote.
Do the options change the permit?
Some do. Offices, enclosed rooms, lifts and sprinkler changes are part of the drawings the city reviews, so we settle the options before the permit is filed.
Source: City of Fort Worth Commercial Remodel SOP
10Request for quote
Request a Quote or a Lead Time
Tell us about the building and the deck. A local installer replies with questions or a quote.
- 1Send the size, the use and the clear height.
- 2We confirm the layout, the code points and what we supply.
- 3You get a written quote with the steps and dates.
Prefer to talk? (682) 267-4269
Keep Planning Your Mezzanine
All mezzanine servicesEvery mezzanine, platform, office and parts service on one page.Read more
Mezzanine cost per square footPublished price ranges per square foot and what moves them.Read more
Mezzanine deckingWood, resin board, grating, plate and concrete decks compared.Read more
Stairs, railings and gatesOSHA stairs, guardrail and pallet drop-zone gates.Read more
Fort Worth permits and codeAccela filing, the TABS step, IBC 505 and OSHA rules.Read more
Mezzanine installation in Fort WorthMezzanine installation for Fort Worth warehouses, plants and shops.Read more

Reliable Mezzanine Installation in Fort Worth
- Decks sized to your load.
- Layouts checked to code.
- Installs planned around your floor.