Fort Worth, Texas · Warehouses, plants and shops
Mezzanine Installation in Fort Worth, TX
We supply and install mezzanines for Fort Worth warehouses, plants and shops. You order the mezzanine through us, and our crew handles the layout, the permit paperwork and the installation.
- Licensed and insured
- Supplied and installed
- Checked to IBC 505 and OSHA 1910
- Stairs, guardrail and pallet gates
- Tarrant County and nearby

- 7 ftclear above and below the deckIBC 505.2
- 1/3of the room, the area limitIBC 505.2.1
- 42 intop rail, plus or minus 3OSHA 1910.29
- 125 psflight storage live loadIBC Table 1607.1
Floor-space estimator
How much floor can you add?
8,000sq ft
of mezzanine floor you can add, up to one-third of the room
32,000 sq ft of usable floor in total, about 33% more
- Sprinklered Type I or II building with a voice alarm systemup to 12,000 sq ft
- Height checkFits the 7 ft rule
Planning estimate from IBC 505.2 and 505.2.1 (2021 IBC, 2021 IBC Section 505, via UpCodes (Texas)). Fort Worth builds to the 2021 IBC with local amendments. Confirm with the City of Fort Worth and a licensed engineer.
02Mezzanine types
Mezzanine Installation Services in Fort Worth, TX
Build up, not out. Add a warehouse mezzanine in the height you already pay for. Pick the type that fits your load and your layout, or see the industries we serve.
-
01 Structural steel mezzaninesFree-standing steel columns on base plates anchored to the slab carry the beams and joists under the deck. IBC Table 1607.1 sets 125 psf for light storage and 250 psf for heavy storage.Details
-
02 Rack-supported mezzanines and pick modulesPallet rack uprights carry the walkway decks, so the rack and the slab are checked for the added load. Open edges 4 feet or more above a lower level need fall protection (OSHA 1910.28(b)(1)).Details
-
03 Shelving-supported mezzanines and catwalksShelving posts carry a second tier, with grated or solid catwalk aisles between the bays. It suits small-parts storage and hand picking, with the deck rated for the stock and the people on it.Details
-
04 Mezzanine officesAn in-plant office on a steel deck, sized to the 50 psf office live load in IBC Table 1607.1. The layout is checked against the enclosed-space limits of IBC 505.2.3 before steel is ordered.Details
-
05 Equipment platforms and crossoversAn unoccupied platform used only for machinery or process equipment falls under IBC 505.3 and adds no building area or story. Stairs, ladders, guards and crossovers give service access.Details
-
06 Stairs, guardrail and pallet gatesStandard stairs at 30 to 50 degrees (OSHA 1910.25) and guardrail with a 42 in top rail, plus or minus 3 in, and a midrail (OSHA 1910.29). A gate closes every pallet drop opening.Details

03Structural Steel Mezzanines
Structural Steel Mezzanines in Fort Worth
A structural steel mezzanine stands on its own columns, bolted to your slab. It does not lean on your racking or walls. You get storage, pack-out or office space on top and working floor below.
We start with what goes on the deck. Light storage is commonly specified at 125 psf and heavy storage at 250 psf. Then we choose framing, decking, stairs and gates to suit.
- Typical useStorage, pack-out, offices
- Code minimum load125 psf light storage, 250 psf heavy (IBC Table 1607.1)
- FramingC-section, beam, bar joist or rigid frame

04Rack-Supported Mezzanines and Pick Modules
Rack-Supported Mezzanines and Pick Modules in Fort Worth
In a rack-supported mezzanine, the pallet rack uprights carry the walk decks. Pickers work every level, and conveyor can run through the middle.
We check the rack layout and the slab before decks go in. Every open edge gets guardrail. Every pallet drop gets a gate.
- Typical useOrder picking, fulfilment, parts
- Edge ruleGuardrail at edges 4 ft or more up (OSHA 1910.28(b)(1))
- OptionsCarton flow, conveyor, finger or impact gates

05Mezzanine Offices
Mezzanine Offices in Fort Worth
Put the office above the floor it runs. A modular office on a steel deck keeps the ground level free for work.
Office floors carry a 50 psf code minimum. An enclosed office must fit an exception in IBC 505.2.3, such as 10 or fewer occupants or two exits. We plan for that in the layout.
- Typical useSupervisor offices, QA rooms, break rooms
- Code minimum load50 psf offices (IBC Table 1607.1)
- OpennessIBC 505.2.3 exceptions for enclosed space

06Equipment Platforms
Equipment Platforms in Fort Worth
An equipment platform holds machinery, not a work floor. Under IBC 505.3 it is not part of the floor below and is never an exit route.
Equipment platforms in a room can total two-thirds of its area. In sprinklered buildings they need sprinklers above and below where the standards require. We add guards, ladders or stairs for service access.
- Typical useDust collectors, HVAC, conveyor crossovers
- Area limitTwo-thirds of the room (IBC 505.3.1)
- Catwalk load40 psf plus 300 lb point load (IBC Table 1607.1)
07Build up
Build Up: Add a Second Floor Without Moving
Expand up, not out. A code-compliant mezzanine is part of the story below, so you add usable floor inside the building you already have. IBC 505.2
Check how much floor your building can add-
Add a second floor to a warehouseA second floor of storage or work space on its own steel frame, up to one-third of the room.See add a second floor to a warehouse
-
Warehouse storage platformsPallets and cartons on a rated steel deck, with open floor kept below for work.See warehouse storage platforms
-
Warehouse loftsA warehouse loft is a mezzanine. We build them for shops, stockrooms and small warehouses.See warehouse lofts
-
Warehouse pick modulesRack-supported walk decks stack picking on several levels, often with conveyor.See warehouse pick modules
Need Floor Space Fast in Fort Worth?
Add a level inside the building you already lease. Call us, or send your floor size and clear height.
08Permits and code
Fort Worth Mezzanine Permits, IBC 505 and OSHA Rules
Yes, a Fort Worth mezzanine needs a commercial building permit. The city builds to the 2021 International Building Code, with local amendments. These rules shape your layout.
- 01
Permit
File a commercial building permit on the city's Accela Citizen Access site. The city decides the permit type.
IBC 105.1; Fort Worth SOP - 02
TABS number
Projects costing $50,000 or more also need a TDLR TABS registration number.
Fort Worth SOP - 03
One-third rule
Mezzanines in a room can total one-third of its floor area. Some sprinklered Type I or II buildings with a voice alarm system may reach one-half.
IBC 505.2.1 - 04
7 ft clear
Keep at least 7 feet of clear height above and below the deck.
IBC 505.2 - 05
Open to the room
The mezzanine stays open to the room, except walls up to 42 inches, columns and posts. Exceptions apply.
IBC 505.2.3 - 06
Part of the story below
A code-compliant mezzanine is not a new story. Its area still counts toward the fire area.
IBC 505.2 - 07
Guardrails
Open edges 4 feet or more above the floor need fall protection. Top rails sit at 42 inches, plus or minus 3.
OSHA 1910.28(b)(1), 1910.29(b)(1) - 08
Gates
Access openings need a self-closing gate, or a guardrail offset so no one walks into the hole.
OSHA 1910.29(b)(13) - 09
Load signs
Floors designed for more than 50 psf get durable load signs. No certificate of occupancy until they are up.
IBC 106.1, 106.2
We lay out your deck against these rules before steel is ordered. Fort Worth amends the IBC locally, and its plan review has the final word.
Sources, read November 2026: City of Fort Worth, Building & Energy Codes · City of Fort Worth, Commercial Remodel SOP (2020) · 2021 IBC Section 505, via UpCodes (Texas) · 2021 IBC Sections 105 and 106, via UpCodes (Texas) · OSHA 29 CFR 1910.28 · OSHA 29 CFR 1910.29
09Options catalog
Mezzanine Options and Designs in Fort Worth
Choose the type, deck, access, gates and lifts. We supply every option and our crew installs it.
-
Mezzanine types
Mezzanine types
- Structural steel
- Rack-supported
- Shelving-supported
- Modular (bolt-together)
- Pick modules
- Equipment platforms
- Catwalks and crossovers
-
Decking
Decking
- Wood board over steel deck
- Resin board or composite panels
- Steel bar grating
- Steel floor plate
- Concrete on form deck
-
Access
Access
- Standard stairs, 30 to 50 degrees
- Ship stairs, 50 to 70 degrees
- Alternating tread stairs
- Stair landings
- Fixed ladders
-
Safety gates
Safety gates
- Two-gate pivot gates
- Double-drop and overhead gates
- Swing and slide gates
- Rolling slide gates
- Finger and impact gates
- Open-gate alarms
-
Lifts
Lifts
- Vertical reciprocating conveyors (VRCs), no riders
- Rideable material lifts, not a public elevator
Lead times Ask for the current lead time on any option. Your quote lists the dates for each step, from drawings to install.
Supplied and installed You buy the mezzanine and every option through us, and our crew installs it. See every option and design
10Service area
Mezzanine Installation Near Me: Fort Worth and Tarrant County
We install mezzanines across Fort Worth and the cities around it.
From AllianceTexas in the north Fort Worth corridor to CentrePort, south of DFW Airport, and the Meacham airport area.
Counties: Tarrant, Dallas, Denton, Johnson, Parker, Ellis and Wise counties.
If your building is in Tarrant County or next door, we probably cover you.
- Fort Worth
- Haltom City
- Arlington
- Grand Prairie
- North Richland Hills
- Hurst
- Euless
- Bedford
- Keller
- Saginaw
- Haslet
- Burleson
- Mansfield
- Benbrook
- Crowley
- Weatherford
- Southlake
- Grapevine

11Why choose us
Why Fort Worth Facilities Choose Us
- 01
Sized to your load
We match the deck rating to what you will store.
- 02
Code checked before steel is ordered
Every layout is checked against IBC 505 and OSHA 1910.
- 03
Gates at every drop zone
Self-closing or two-gate designs where pallets land.
- 04
One order, one crew, one point of contact
You buy the mezzanine through us and our crew installs it.
- 05
Built around your shifts
We plan the install around how your floor runs.
- 06
Licensed and insured
Proof on request.
12Questions
Mezzanine Installation Questions, Answered
Do you supply the mezzanine or only install it in Fort Worth?
We supply and install it. You buy the mezzanine through us: the steel frame, deck, stairs, guardrail, gates and any lift. We coordinate the engineered drawings and the permit submission, and our crew installs it. One order, one crew, one point of contact.
Source:
Do I need a permit for a mezzanine in Fort Worth?
Yes. The IBC requires a permit to build or alter, and Fort Worth takes commercial applications on its Accela Citizen Access site. Projects costing $50,000 or more also need a TDLR TABS registration number. The city decides the permit type, and its plan review checks the drawings.
Source: IBC 105.1; City of Fort Worth Commercial Remodel SOP
How big can a mezzanine be in Fort Worth?
Up to one-third of the floor area of the room it sits in. That is the base rule in IBC 505.2.1. Some Type I or II buildings with sprinklers and an emergency voice/alarm system may reach one-half. Special industrial occupancies in Type I or II buildings can reach two-thirds.
Source: IBC 505.2.1
How much clear height does a Fort Worth mezzanine need?
At least 7 feet above and 7 feet below the deck floor construction. So your building needs more than 14 feet of clear height, plus the depth of the deck structure. We measure it on the site visit.
Source: IBC 505.2
How much does a mezzanine cost per square foot in Fort Worth?
Published planning ranges put most mezzanines at about $40 to over $250 per square foot, with basic storage decks lower. These are planning ranges, not our quote. Your price depends on size, height, load, decking, stairs, gates and the permit, and comes from a written quote for your building.
Source:
What load rating should my Fort Worth warehouse mezzanine have?
It follows the use. IBC Table 1607.1 sets 125 psf for light storage, 250 psf for heavy storage and 50 psf for offices. The design load must cover the heaviest use you expect. Your engineer sets the final rating, and floors over 50 psf get posted load signs.
Source: IBC Table 1607.1, 1607.3, 106.1
What guardrail and gate rules apply to mezzanines in Fort Worth?
OSHA requires fall protection at open edges 4 feet or more above the floor. Top rails sit at 42 inches, plus or minus 3, with a midrail, and must hold 200 pounds. Toeboards are at least 3.5 inches. Access openings need a self-closing gate or an offset.
Source: OSHA 1910.28(b)(1), 1910.29(b), (k)
How long does a mezzanine project take in Fort Worth?
It depends on the design, the permit review and the parts you choose. After the drawings and the permit come delivery, installation, inspection and load signs before the certificate of occupancy. We give you the dates for each step in the quote.
Source: IBC 106.2
Does a mezzanine count as another story in Fort Worth?
No, not if it meets IBC 505.2. A compliant mezzanine is part of the story below. It adds no building area or story count, but its area does count toward the fire area.
Source: IBC 505.2
13Request for quote
Build Your Quote
Tell us about the building and the deck. A local installer replies with questions or a quote.
- 1Send the size, the use and the clear height.
- 2We confirm the layout, the code points and what we supply.
- 3You get a written quote with the steps and dates.
Prefer to talk? (682) 267-4269

Reliable Mezzanine Installation in Fort Worth
- Decks sized to your load.
- Layouts checked to code.
- Installs planned around your floor.